IFM Opac
Image from Google Jackets

How To use cost benefit analiysis in project apprausal.

By: Contributor(s): Material type: TextTextPublication details: Britain Biddles ltd. 1971.Edition: 2endDescription: xiv,202. ill,;25cmISBN:
  • 0 7161 0276 5.
Subject(s): DDC classification:
  • 658.155 4
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Status Date due Barcode Item holds
Books Books IFM Main Campus Library MISALLOCATED IFM Main Campus Library 658.155 4 (Browse shelf(Opens below)) Available 0000008316
Total holds: 0

Include index.